Area C mine - fuel facility and sample preparation laboratory
Project Service: Industrial construction and non-process infrastructure
Client: BHP Billiton
Location: Area C mine, 120 km northwest of Newman, Western Australia
Start Date: 2006
Completion Date: 2007
We were awarded two portions of the new expansion works, the first being the fuel storage and handling facility at E Deposit.
Works for this contract included design and shop detailing of all specialised equipment such as the fabrication of specialised equipment, structural steelwork, piping and storage tanks.
The second portion of the contract was the Sample Preparation Building, with work including the shop detailing, fabrication, transportation, construction and commissioning.